![]() Analysis results of lovers were grayed out. ![]() In the box profile column, the K value was calculated large. The full body column was displayed incorrectly in the analysis model. The clearance at the deflection boundary was not taken as expected in the secondary beams divided into secondary beams. In steel elements, the deflection limit was overestimated compared to 8.504. Measures were taken against program crashes in a project where the truss was deformed. Steel design options If TÇY GKT is selected, the combination containing +0.525Ey was missing from the loading combinations. In some projects, analysis could not be performed when artificial column combinations were modeled between columns. Elements appear to be overlapping in the overlap check even though the column-beam is connected using a welded joint. There was an error in the deflection calculation of the steel purlins. When the data was entered with the hall macro, there was a deficiency in the loading combinations. Incorrect clear clearance was calculated while deflection control was performed in the project. It was not opening and breaking in a project. The program would break if mirroring was performed by selecting the cross member and its combinations. In the project, steel drawings could not be obtained properly without removing the reinforced concrete elements. When the Scissors Purlins were not included in the analysis system, the purlin results were not formed properly, the deflection was not calculated. ![]() When the console was added to the purlins, the deflection upper limit value and the deflection of the element were calculated incorrectly. If TÇY is selected as the regulation for steel, earthquake combinations were missing in loading combinations in GKT and YDKT. If the ide7 projects are opened at ide.85 and the scaffold is entered, the slab loads are incorrect and all of the sections looked inadequate. ![]() The program crashes when the coating is defined and analyzed. For detailed information, you can get information from our Bursa or Istanbul office. Note: Upgrading from versions 7 and earlier to 8 requires license renewal. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2022
Categories |